
Kirkcaldy
A new drain tie-in for a client's extension into the existing clay pipework, with access points for future maintenance.
Another dig, this time for our client's new extension.


The new drain was tied into the existing clay pipework, with access points for future maintenance.

Backfilled, levelled and slabbed for access, with the access cover left high to be adjusted when the porcelain slabs get laid.
Slabbed for access, with the cover left high for the porcelain slabs to come.
His own post about the job, word for word.
Another dig completed in Kirkcaldy.
New drain tie in installed for our client's extension into existing clay pipework with access points for future maintenance. Backfilled, levelled and slabbed for access just now and left access cover high to be adjusted for when the porcelain slabs get laid.
Call 07807 688785, day or night. 24/7 emergency call-outs across Fife, Tayside and Edinburgh, with no call-out charge.
More on new drainage